
By project
Dumpster Rental by Project
Pick your project to see the right dumpster size, the weight math for that debris, and the rules that apply. Roofing and remodel jobs most often use a 20-yard; concrete and dirt use a 10 or 15-yard loaded halfway; construction uses a 30-yard.
Choose your project
Each project page sizes the dumpster for that debris, shows the weight math, and lists the rules that apply, from OSHA chutes on tall roofs to the half-full rule for concrete. Not sure where your job fits? The size guide's three-question picker narrows it down.
RoofingSize by squares and layers
RemodelKitchen and bath sizing
CleanoutGarage, estate and move-out
ConstructionSwaps and site rules
Concrete & dirtHeavy debris, half full
Yard wasteBrush, limbs and stumps
Property cleanoutNo need to be on site
Storm debrisFlood, wind and hail
Major demolition40-yard, 5 to 6 tonsCommercial front-load2 to 8-yard bins, scheduled pickupStart with the dumpster size guide or read what a dumpster costs.
Talk to the dispatcher, not a call center
Not sure which project fits?
Describe the job on the phone. We'll pick the size and tell you what it includes.